#1 – 2528 Turner St vs 3509 Turner St
#1 – 2528 Turner St is the older building (1951); 3509 Turner St was built in 2019. Both are zoned R1-1. Each has 3 building permits since 2017. Neither is in a designated floodplain.
| #1 – 2528 Turner St | 3509 Turner St | |
|---|---|---|
| Type | Strata unit | Strata, 2 units |
| Neighbourhood | Hastings-Sunrise | Hastings-Sunrise |
| Built | 1951 | 2019 |
| Assessed | — | $1,732,000 |
| Change from last year | — | −6% |
| Against the street | — | — |
| Lot | — | ≈ 474 m² |
| Zoning | R1-1 | R1-1 |
| In a floodplain | No | No |
| On the Heritage Register | No | No |
| Permits since 2017 | 3 · Mar 2025 | 3 · Oct 2019 |
| Findings | 2 Check 6 Note | 2 Check 6 Note |
| School catchment | Lord Elementary | Franklin Elementary |
| Nearest SkyTrain | Commercial-Broadway Station, 2.1 km | Gilmore Station, 1.9 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: #1 – 2528 Turner St Full report: 3509 Turner St